Muscat International Airport Fuel System Oman

CLIENT

Consolidated Contractors Co.

CONSULTANT

Hill International

SCOPE OF WORK

Design & Build

TRANSPORT & LOGISTICS | AVIATION

Muscat International Airport Fuel System

AMANA was awarded the contract for the Fuel Hydrant system (Staging Facility) for Muscat International Airport Package (MC-1).

This included the engineering, procurement, construction & commissioning of a new Fuel Hydrant System comprising of 14 kms of fuel pipe ranging from 12” to 24” in diameter from the Apron Area to the Fuel Farm. Including 146 hydrants comprising of API standard hydrant pits, under hydrant valves and testing and commissioning of entire fuel hydrant system.

Phase 2 of this project included the engineering, procurement, construction & commissioning (EPCC) of a new Fuel farm to include 4 Nos. Jet A1 aviation fuel storage tanks of 9,000 m3 to API 650 and1 Nos. Jet A1 aviation de-fuelling storage tanks of 300 m3 to API 650. The completed site consisted of a fully automated fuel farm with three storage tanks and related equipments and instruments. Firefighting system design, engineering, procurement, construction and commissioning also completed. 3 Nos. Jet A1 aviation fuel storage tanks of 1,300 m3 to API 650 1 Nos. Fire Water tank with a capacity of 500 m3 to API 650

API 650

14km

Fuel Pipe

ESD & LDS

Hydrant Control Systems

2019

Completion Year